Client: Fulton Hogan
Project: Pressure Main 105
Lead Contractor: Fulton Hogan
Work Required: Polyethylene Welding
Daniel was initially involved with polyethylene welding on this project in his role as Technical Operations Manager for Frank PKS.
During the course of this project, a pressure pipe failure was discovered with multiple leaks on all the joins for installations not done by Fusion Solutions. Due to his reputation and specialist knowledge, Daniel was engaged independently by Fulton Hogan to use his expertise and find a solution. We implemented a methodology which enabled the repair to be done quickly within the one month timeframe and save SCIRT a substantial amount of money.
Through Daniel’s process of checking, proving and testing, all joins were successfully repaired and passed the low pressure air test without exception.