Hicks Brothers Preston Subdivision

Client: Hicks Brothers Project: Prestons Subdivision Lead Contractor: Hicks Bothers Work Required: Polyethylene Welding Fusion Solutions are providing polyethylene pipe installations for the new vacuum sewage facilities on this large subdivision. Prior to Daniel's involvement, there had been issues with the fabrication and fitting of the pipes. Under Daniel's management, the pipes are now designed…

Christchurch Ocean Outfall Project

Client: McConnell Dowell Project: Christchurch Ocean Outfall Lead Contractor: McConnell Dowell Work Required: Polyethylene Welding This project involved the installation of a 5km ocean outfall pipeline stretching 5km out into Pegasus Bay. Fusion Solutions worked with McConnell Dowell on the polyethylene pipe design, welding and installation work. Early on, there had been many problems with…

Fulton Hogan Pressure Main 105

Client: Fulton Hogan Project: Pressure Main 105 Lead Contractor: Fulton Hogan Work Required: Polyethylene Welding Daniel was initially involved with polyethylene welding on this project in his role as Technical Operations Manager for Frank PKS. During the course of this project, a pressure pipe failure was discovered with multiple leaks on all the joins for installations…